Evidence readiness

Transformer Evidence Readiness Checker

Score readiness across DGA, PRPD, SFRA, thermal/loading, inspections, maintenance history, provenance, and approval paths.

Interactive planning tool

Transformer Evidence Readiness Checker

Select the evidence your team can review today. The checker stays in your browser, does not upload data, and only estimates pilot readiness for planning conversations.

Answer the questions to compute a result. Everything runs in your browser — nothing you enter is uploaded. About 3 min to complete

Evidence coverage

0 of 10 answered

How the scoring works

Every GridAPM tool scores against the same transparent rubric — no hidden thresholds.

Each factor you check adds its listed weight to your earned points; some context selections add more. The score is your earned points divided by the maximum available, shown on a 0–100 scale.

Factor weights are printed on the cards themselves whenever they differ, so you can see exactly why the score moves.

The four bands, identical across every GridAPM tool:

  1. 0–39 Early Foundational pieces are missing. Use the gaps below as a starting agenda.
  2. 40–64 Partial Some elements are in place, but key gaps would slow a pilot down.
  3. 65–84 Reviewable Strong enough to bring into a scoping conversation and review together.
  4. 85–100 Ready Well positioned to scope a pilot now.

The score measures how ready your team is to scope a pilot — never the condition of any asset.

What this tool is — and is not

This is a planning aid computed entirely in your browser. It does not assess transformer condition, does not replace IEEE or IEC guidance or engineering judgment, and its output is not a diagnostic conclusion. Use it to prepare a pilot conversation.

No diagnostic authority
The tool does not determine transformer condition, approve maintenance, certify standards compliance, or replace qualified engineering judgment.
No private source intake
Do not enter confidential asset names, work-order IDs, network details, customer data, or proprietary measurements into public planning tools.
Human review stays central
GridAPM positions AI draft output as review material until authorized reviewers approve, edit, reject, or escalate it.

FAQ

Boundaries for this tool.

Does Transformer Evidence Readiness Checker upload asset data?

No. The tool runs in the browser and does not upload files, asset identifiers, work orders, feeder data, or tool inputs to GridAPM.

Is Transformer Evidence Readiness Checker diagnostic advice?

No. It is a planning aid for pilot scoping and evidence readiness. It does not diagnose transformer condition, approve maintenance, certify compliance, set operating limits, or replace qualified engineering review.

How does this connect to a GridAPM pilot?

Use the output to frame a controlled pilot around approved evidence sources, reviewer roles, AI-assist boundaries, security expectations, and measurable workflow outcomes.

Turn the result into a pilot conversation.

Share the non-confidential result with GridAPM to discuss approved evidence sources, security boundaries, reviewer ownership, and a measurable first workflow.

Type to search research, platform pages, and tools.