Transformer evidence pack with a visible review trail.

This synthetic demo shows how approved transformer evidence can move from source inventory to quality review, AI draft, engineer approval, and an audit-ready evidence pack. It is not diagnostic advice and does not represent a real asset.

Synthetic TX-47 74/100

Evidence readiness score

High readiness for structured pilot review

Sample status only. Scores and evidence values are illustrative and not tied to a real transformer.

Synthetic profile for a controlled review package.

A real pilot would replace every value below with approved customer evidence, source links, reviewer ownership, and retention expectations agreed in advance.

Asset Synthetic TX-47
Voltage class 230/69 kV
Role Critical transmission supply transformer
Cooling ONAN/ONAF
Pilot status Approved synthetic training dataset

DGA and oil evidence snapshot

Signal Latest synthetic value Trend note Review state
Hydrogen96 ppm+18 ppm / 90 daysWatch
Methane42 ppm+7 ppm / 90 daysStable-watch
Ethylene8 ppm+1 ppm / 90 daysStable
Acetylene0 ppmNo detected movementStable
Moisture19 ppmStable after oil serviceStable

What reviewers can inspect before trusting the package.

The matrix separates evidence availability from final condition judgment. GridAPM should help surface gaps, not hide them.

Evidence area Synthetic source material Readiness Reviewer note
DGA and oilRecent lab reports, method notes, unitsReviewableTrend needs continued watch
PRPDPattern export, channel context, noise notesPartialAdd test setup notes
SFRABaseline and latest comparisonReviewableConfirm bushing configuration notes
Thermal/loadingLoading profile, ambient, cooling stateReviewableAdd hot-spot assumption owner
Maintenance historyOil service, inspection notes, work ordersReviewableClose one follow-up action
Approval pathAsset engineer, maintenance planner, reliability ownerReadyDefine escalation threshold

Evidence moves forward only after human review.

The AI draft can organize evidence and ask review questions, but the decision record remains owned by qualified reviewers.

  1. 1. Evidence imported Source files registered with synthetic provenance labels
  2. 2. Quality review Units, dates, asset identity, and missing notes checked
  3. 3. AI draft Draft summary created with watch items and open questions
  4. 4. Engineer review Draft edited; PRPD and thermal assumptions kept as watch items
  5. 5. Evidence pack Human-reviewed package marked ready for pilot discussion

What a pilot team can ask GridAPM to prepare.

A production pilot should define the export format, approval states, evidence retention, and the handoff path to maintenance, asset management, reliability, procurement, or governance teams.

Source evidence inventory
DGA trend summary
PRPD measurement-quality note
SFRA comparison note
Thermal/loading context
Maintenance history extract
AI draft rationale with reviewer edits
Approval and exception log