Pilot evaluation

Prove the workflow before broad deployment

An eight-week, fixed-scope evaluation on your own transformers: approved evidence in, agent-drafted analyses reviewed by your engineers, and an evidence pack your organization can take to a decision.

  • Defined pilot scope
  • Evidence-readiness checklist
  • Review workflow and sample report
  • Conservative value framework

Pilot timeline

Eight weeks from scope to decision

Three duration bands, each closing on a deliverable you keep — no open-ended discovery phase.

  1. Weeks 1–2

    Evidence intake

    Asset list, approved historical records, and source files land in the workbench. Quality gates flag gaps and duplicates while the evidence model is configured for your fleet.

    Deliverable

    Evidence intake report

    What passed the quality gate, what is missing, and exactly what the pilot will analyze.

    Quality-gated DGA trend
    • H2
    • CH4
    • C2H4
    • C2H2
    Quality-gated DGA trend Line chart of dissolved gas concentrations in ppm over 13 oil samples. H2 ends at 148 ppm, CH4 ends at 74 ppm, C2H4 ends at 58 ppm, C2H2 ends at 11 ppm. H2 watch level: 80 ppm. Gassing event marked at sample 9. H2 watch level Gassing event
  2. Weeks 3–6

    Agent drafts + engineer review

    The agent drafts per-unit analyses with cited evidence. Your engineers approve, edit, reject, or escalate in weekly review cycles — every decision lands in the audit log.

    Deliverable

    Reviewed work packages

    Engineer-signed work packages for the units that need action, formatted for your CMMS.

    Reviewed Engineer sign-off stamp: Reviewed, initials R.K., dated Mar 12, 2026. Reviewed R.K. Mar 12, 2026
  3. Weeks 7–8

    Evidence pack + decision

    Findings, rationale, and the full review history are assembled into the final evidence pack, with a value memo scoped to your success criteria.

    Deliverable

    Evidence pack + value memo

    A procurement-ready pack: condition evidence, AI rationale, the sign-off trail, and a conservative value summary.

    Health index
    Health index Semicircular health-index gauge reading 82 of 100, in the Good band. Bands: Poor 0–40, Fair 40–70, Good 70–100.
    82 / 100
    Good
    Poor 0–40 Fair 40–70 Good 70–100

Deliverable previews show synthetic specimen data, not customer results.

Scope

What the pilot covers — and what comes later

A pilot proves the workflow on a bounded population before any enterprise commitment.

Pilot scope compared with full deployment, by dimension.
Dimension In the pilot Full deployment
Transformer population A focused population where historical evidence exists The full fleet, onboarded in criticality order
Integrations Approved historical records and controlled datasets — no live integrations Live CMMS, EAM, and historian connections, evaluated after the workflow proves useful
Decision workflow One decision workflow with named review owners Additional workflows and teams, added one at a time
Outputs Evidence pack, reviewed work packages, and a value memo Continuous review cycles and fleet-wide reporting
Deployment An engineer workstation inside your perimeter — no OT connection Deployment shaped by your IT and security review

Success metrics

Measure decision quality, not hype

Evaluation focuses on preparation time, evidence completeness, review clarity, traceability, and usefulness for lifecycle and sustainability planning.

Preparation time
Time to assemble a review-ready diagnostic file, measured before and during the pilot.
Evidence completeness
Share of scoped units with a complete, quality-gated evidence record.
Health-index clarity
Whether engineers can explain each unit's score drivers from the workbench alone.
Traceability
Every recommendation resolves to its source records in one step.
Engineer confidence
Reviewer assessment of the draft-and-review workflow after each cycle.
Lifecycle usefulness
How useful the outputs prove for lifecycle and sustainability planning.

Cross-industry context from the U.S. DOE FEMP O&M Best Practices Guide — what functional predictive-maintenance programs have averaged in independent surveys:

25–30% 1

reduction in maintenance costs

35–45% 1

reduction in downtime

10x 1

return on investment

Engagement model

What each side provides

A pilot is a joint effort with a deliberately small footprint on your team.

Your team provides

  • Named engineer-reviewers for the weekly review cycles
  • Approved historical records and asset identifiers
  • The decision workflow and success criteria to evaluate
  • A workstation inside your perimeter

GridAPM provides

  • Workbench deployment and evidence-model configuration
  • Agent-drafted analyses for every scoped unit
  • Facilitation of the weekly engineer review sessions
  • The evidence pack, work packages, and value memo

Pilot FAQ

Questions before the first evaluation

How many transformers should a pilot include?

A focused first pilot starts with a small population where historical evidence exists and the team has a clear review workflow to evaluate.

Do we need live integrations for a pilot?

No. A pilot can begin with approved historical records and controlled datasets. Live integrations can be evaluated after the workflow proves useful.

What does GridAPM claim during a pilot?

Decision support with engineers holding final authority. The pilot measures preparation time, traceability, and review quality on your own evidence — it makes no claims of guaranteed failure prevention, autonomous control, or quantified performance until your evidence supports them.

How long does a pilot take?

Eight weeks on a fixed scope: evidence intake in weeks 1–2, agent drafts and engineer review cycles in weeks 3–6, and the evidence pack and decision in weeks 7–8.

Scope your pilot

Your units, your data, your reviewers — eight weeks to an evidence pack you can put in front of procurement.