GridAPM tool
IBR Event Evidence Readiness Checker
Scope inverter-based resource event evidence across relay, PMU, controller, model, commissioning, timeline, and reviewer boundaries.
IBR Event Evidence Readiness Checker
Public client-only planning tool for inverter-based resource event evidence readiness for utility, TSO, DSO, generation, renewable owner, and reliability teams.
Event evidence inputs
Use generic ranges only. Do not enter plant names, asset IDs, customer data, model files, protection settings, or live operating details.
Readiness result
The event has enough evidence shape for a focused IBR pilot, but missing sources and approval boundaries should constrain the first scope.
Suggested first pilot scope
Human-reviewed IBR disturbance timeline with source-linked logs, event records, and reviewer questions
Top missing gaps
Controlled event evidence path
- ScopeChoose one event window, source boundary, and reviewer owner.
- AlignNormalize timestamps, versions, provenance, and timeline references.
- DraftAI assists with evidence organization and reviewer questions.
- ReviewQualified people approve, edit, reject, or escalate outputs.
- PackageProduce a traceable evidence pack for the approved pilot scope.
IBR event evidence comparison
| Event source | Evidence needed | Agentic AI assist | Human approval boundary |
|---|---|---|---|
| PMU, relay, SCADA, or event records | Time-aligned event files, targets, alarms, sequence markers, export dates, and source owners. | Assemble a disturbance timeline, identify gaps, and draft reviewer questions with source references. | Operations, protection, reliability, or engineering reviewers accept the timeline and any escalations. |
| Inverter, plant controller, or OEM logs | Read-only logs, controller status, firmware context, model/version references, and plant/customer notes. | Organize log evidence, compare timestamps, and summarize candidate questions for qualified reviewers. | Owner, OEM, generation, or utility reviewers decide what can be used, shared, or escalated. |
| Models, commissioning, and protection context | Model/version records, change logs, commissioning tests, settings evidence, and documented assumptions. | Flag mismatches between event evidence and documented context without approving settings or models. | Formal studies, compliance, legal, protection, and interconnection approvals stay outside the tool. |
This checker is a client-only planning aid: no uploads and no server submission; tool inputs stay local. Optional site analytics, when accepted, does not receive selected tool values. It is not root-cause authority, EMT/RMS simulation, NERC compliance/legal advice, protection-setting approval, interconnection approval, or autonomous operations.
Pilot boundary
Use the result as a review-starting point.
Public tool outputs are designed to help utility, TSO, DSO, generation, data center, oil and gas, and industrial teams frame a controlled GridAPM discussion before approved evidence enters a local-first transformer APM workflow.
Next step
Turn the tool output into a pilot conversation.
Share the non-confidential result with GridAPM to discuss approved evidence sources, security boundaries, reviewer ownership, and a measurable first workflow.
Related tools
Continue scoping the pilot surface.
These adjacent tools help convert readiness, evidence gaps, governance questions, and handoff fields into a stronger pilot brief.
Pilot Brief Builder
Generate a first-pass GridAPM pilot brief for transformer APM evidence, workflow pain, reviewer roles, data boundaries, and success metrics.
Open tool
Transformer Maintenance Work Package Builder
Draft a human-reviewed transformer maintenance work-package outline from condition evidence, maintenance history, criticality, approval states, and CMMS/EAM handoff fields.
Open tool
Utility OT AI Risk Register Builder
Create a first-pass risk register for approval-gated transformer APM AI workflows across OT boundaries, source approvals, agent permissions, cybersecurity review, and audit artifacts.
Open tool